Livnoutdoorsxd9
Active Member
Hey guys, I'm starting my second knife. Its a drop point with micarta scales. I did a little pre-shaping and then glued and clamped up one side. The package says 60 minute gel time and 24-36hr full cure at 77F. Do I have to wait the full 24-36hr before I start doing more sanding?
On a side note, i'm pretty sure I bought black micarta, but working it, it looks more green. Is this common, or did I get the wrong color? I dont care either way, was just curious.
On a side note, i'm pretty sure I bought black micarta, but working it, it looks more green. Is this common, or did I get the wrong color? I dont care either way, was just curious.